Through Enpower 3 Moncada Energy Group has begun work on a wind farm in the locality of Cattolica Eraclea (AG) with a power capacity of 40 MW. 20 turbine generators with a power of 2 MW will be installed. The farm will enter into production in the second half of 2009.
